Operationaloffshore
Race Bank (Phase 1)
Offshore, England
Capacity289.8 MW
Turbines 46
Source-linked REPD label · Entity verification pending
DESNZ supplies one combined “Operator (or Applicant)” field. This beta groups exact source labels (original label: Orsted (formerly Dong Energy)/ Macquarie Group); it does not yet assert legal ownership, parent-company relationships or resolved company identity.
Map shows active records with coordinates. Points are source reference locations, not turbine positions or boundaries. The table includes all linked source records.
| Project | Region | Snapshot status | Recorded capacity (MW) | Applicant / operator |
|---|---|---|---|---|
| Race Bank (Phase 1) | Offshore | Operational | 289.8 | Orsted (formerly Dong Energy)/ Macquarie Group |
| Race Bank (Phase 2) | Offshore | Operational | 283.5 | Orsted (formerly Dong Energy)/ Macquarie Group |
Offshore, England
Offshore, England