Awaiting Constructiononshore
Meall Buidhe Wind Farm
Scotland, Scotland
Capacity40 MW
Turbines 8
Source-linked REPD label · Entity verification pending
DESNZ supplies one combined “Operator (or Applicant)” field. This beta groups exact source labels (original label: Muirden Energy); it does not yet assert legal ownership, parent-company relationships or resolved company identity.
Map shows active records with coordinates. Points are source reference locations, not turbine positions or boundaries. The table includes all linked source records.
| Project | Region | Snapshot status | Recorded capacity (MW) | Applicant / operator |
|---|---|---|---|---|
| Drum Hollistan Wind Farm | Scotland | Revised | 51 | Muirden Energy |
| Meall Buidhe Wind Farm | Scotland | Awaiting Construction | 40 | Muirden Energy |
| Cogle Moss Wind Farm | Scotland | Planning Permission Expired | 36 | Muirden Energy |
| Drum Hollistan Wind Farm | Scotland | Application Refused | 35 | Muirden Energy |
| Hill of Glaschyle Wind Farm | Scotland | Operational | 27.6 | Muirden Energy |
| Mormond Hill Windfarm | Scotland | Appeal Refused | 27.6 | Muirden Energy |
| Creag Dhubh | Scotland | Application Submitted | 27 | Muirden Energy |
| Mains Of Collithie | Scotland | Application Refused | 2.4 | Muirden Energy |
| Logie Newton Wind Farm | Scotland | Appeal Refused | 1.6 | Muirden Energy |
Scotland, Scotland
Scotland, Scotland
Scotland, Scotland