Operationalonshore
Barmoor South Wind Farm
North East, England
Capacity13.8 MW
Turbines 6
Source-linked REPD label · Entity verification pending
DESNZ supplies one combined “Operator (or Applicant)” field. This beta groups exact source labels (original label: EDF); it does not yet assert legal ownership, parent-company relationships or resolved company identity.
Map shows active records with coordinates. Points are source reference locations, not turbine positions or boundaries. The table includes all linked source records.
| Project | Region | Snapshot status | Recorded capacity (MW) | Applicant / operator |
|---|---|---|---|---|
| Cromer� | Offshore | Abandoned | 108 | EDF |
| Stranoch Wind Farm | Scotland | Revised | 72 | EDF |
| Braemore | Scotland | Planning Permission Expired | 54 | EDF |
| Bullington Cross Wind Farm (7 of 14 turbines Winchester City Council) | South East | Appeal Withdrawn | 14 | EDF |
| Maumhill Wind Farm | East Midlands | Revised | 14 | EDF |
| Barmoor South Wind Farm | North East | Operational | 13.8 | EDF |
| Dorcas Lane Wind Farm | South East | Application Refused | 10 | EDF |
| Bullington Cross Wind Farm (Basingstoke and Deane) | South East | Appeal Withdrawn | 8 | EDF |
| Boundary Lane | North East | Operational | 6 | EDF |
| Bullington Cross Wind Farm (3 of 14 turbines Test Valley BC) | South East | Appeal Withdrawn | 6 | EDF |
North East, England
North East, England